Background

Manchester’s iconic One St Peter's Square provides Grade A office accommodation that boasts contemporary architecture and state-of-the-art facilities that’s design focuses on sustainability and energy efficiency which has contributed towards its BREEAM ‘Excellent’ rating. Its 271,000 sq.ft of prime City Centre office space is hailed as Manchester’s most prestigious address and is home to many prominent law firms including KPMG, Addleshaw Goddard and Irwin Mitchell. 

Brief

To provide comprehensive planned and reactive mechanical and electrical maintenance and compliance services. 

Summary of works provided

Our on-site engineering team, supported by our mobile engineers, ensure the following assets are regularly maintained in accordance with SFG20 and assures compliance with both UK legislation and insurance requirements. 

  • Lighting and emergency lighting
  • AHUs
  • Gas boilers
  • Chillers
  • Fan coil units
  • Closed system monitoring
  • L8 water hygiene
  • AC systems
  • Sprinkler system
  • Fire alarm & extinguishers
  • Pump sets
  • Water heaters
  • Auto doors and shutters
  • HV systems
  • Standby generator

Our dedicated static engineers ensure the continuity of critical services for One St Peter’s Square reducing the risk of downtime or disruption to tenant operations. We ensure that the building achieves and maintains full legislative compliance, through the scheduled regular maintenance and inspection of critical assets, receiving consistent client audit scores of more than 95 percent.

Case Studies

The Picture House

Read More >

Kaye's Academy

Read More >

Elk Mill Retail Park

Read More >

Welcome Finance

Read More >

Lateral House

Read More >

Serpentine Galleries

Read More >

Extra MSA

Read More >

Withington Girls School

Read More >

Princesshay Shopping Centre

Read More >

Crowngate Shopping Centre

Read More >

IKEA - Livat Hammersmith

Read More >

Boiler replacement project at University of Lincoln

Read More >

Replacement boiler system & BEMS at Morses Club plc

Read More >

Chiller installation at Derwent House

Read More >

HVRF solution design & installation at BAT - Building 25

Read More >

Power outage at Princesshay Shopping Centre

Read More >

Kitchen fire damage at Cobham MSA

Read More >

Flood damage at Twenty Chapel Street

Read More >

Crowngate Shopping Centre

Read More >

The Guinness Partnership

Read More >